Vestas Wind Systems A/S

Vestas Wind Systems A/S

Company Registration No. :
10403782

Company Location :
Various Locations

PRODUCT / SERVICE DESCRIPTION

4 MW platform

Our 4 MW platform is designed for a broad range of wind and site conditions, onshore and offshore, enabling you to mix turbines across your site or portfolio of sites, delivering industry-leading reliability,
.
4 MW platform

Our 4 MW platform is designed for a broad range of wind and site conditions, onshore and offshore, enabling you to mix turbines across your site or portfolio of sites, delivering industry-leading reliability, serviceability and exceptional energy capture.

The 4 MW platform was introduced in 2010 with the launch of the V112-3.0 MW®. Since then over 61 GW of the 4 MW Platform has been installed all over the world, making it one of the most popular platforms in our portfolio.

Rotor diameters range from 105 to 155 meters and the rated output power is up to 4.5 MW. Using well proven technologies like a full-scale converter, the 4 MW platform meets even the most challenging grid requirements, providing excellent energy yield in all wind and weather conditions.

The 4 MW platform combines Vestas’ proven track record with our continuous efforts to improve and optimise our products, making it the obvious choice for customers looking to combine reliability with performance.

Click here to find more on website link : https://www.vestas.com/en/products/4-mw-platform

View more

V163-4.5 MW™

The V163-4.5 MW™, featuring a large rotor-size-to-rating ratio, helps you realise stable energy output and up to 10% more Annual Energy Production at park level under medium to low wind conditions. 

V163-4.5 MW™ at a glance
The V163-4.5 MW™ is an evolutionary optimisation step based on the V150-4.2 MW™ and the V150-4.5 MW™ -  some of our most popular turbine models for medium and lower wind segments. Featuring an 18 percent increase in swept area, the V163-4.5 MW™ has a large rotor-size-to-rating ratio resulting in a higher capacity factor, leading to up to 10 percent higher Annual Energy Production at park level depending on site-specific conditions.

This increases power output at lower wind speeds significantly and improves predictability and stability in production, optimising the utilisation of the wind park as well as benefitting the energy grid. 

Options available for the V163-4.5 MW™ IEC S
  • Condition Monitoring System
  • Service Personnel Lift
  • Low Temperature Operation to -30°C
  • Fire Suppression
  • Vestas Shadow Flicker Control System
  • Vestas Bat Protection System
  • Nacelle Hatch for Air Inlet
  • Aviation Lights
  • Aviation Markings on the Blades

V163-4.5 MW™

0 Views | 0 Likes | 0 Comments

V155-3.6 MW™

0 Views | 0 Likes | 0 Comments

V150-4.5 MW™

0 Views | 0 Likes | 0 Comments

V150-4.2 MW™

0 Views | 0 Likes | 0 Comments

V136-4.5 MW™

0 Views | 0 Likes | 0 Comments

V136-4.2 MW™

0 Views | 0 Likes | 0 Comments

V136-3.45 MW®

0 Views | 0 Likes | 0 Comments

V126-3.45 MW®

0 Views | 0 Likes | 0 Comments

V117-4.2 MW™

0 Views | 0 Likes | 0 Comments

Not Comments Found

Company experience profile

Year Project Name Client Project Location Capacity Remarks


CONTACT US Directly
Subscribe

© 2024 ENERGPLACE Sdn. bhd. All Rights Reserved.